View unanswered posts | View active topics It is currently Sun Nov 19, 2017 10:16 pm




Visit our sponsor

Reply to topic  [ 29 posts ]  Go to page Previous  1, 2
 speeding-g60 25.1g tube chassis Audi project 
Author Message
Jr Dragster Poster

Joined: Sun Sep 02, 2012 10:05 am
Posts: 27
Location: USA
Wheel tub was running right thru gas door so it has to go. Cut it out and cleaned it up. Hand formed a filler plate or plug, rolled out to sit flush, and put it in.

Image

Image

Image

Image

Wheel tubs are trimmed up and evened up and in temporarily. They will be powdercoated along with the rest of the tin for final assembly way down the road when we will also paint the chassis and body.

Image

Image

Image

Image

Image

Image

And a bonfire before I fly back out tomorrow. Such is the life of a working man.

Image


Sun Apr 26, 2015 11:08 am
Profile
Jr Dragster Poster

Joined: Sun Sep 02, 2012 10:05 am
Posts: 27
Location: USA
Image

Image

Image

Flat

Image

Step

Image

Brake one

Image

Brake two

Image

Fit into place

Image

Now the front tub areas

Image

Image


Wed May 27, 2015 12:10 am
Profile
Jr Dragster Poster

Joined: Sun Sep 02, 2012 10:05 am
Posts: 27
Location: USA
doin rear brake pads on Chubs new quad, have a very attentive audience. Peanut (the girl) was all helpful and held the caliper each time i had to get something, even.
Image

morning hot tub.... ahh that country life, so peaceful and quiet and the view? excellent. thats my back yard all the way back to the houses, 875 foot deep the lot is by 250 foot wide.

Image

Chub riding Awesomeness

Image

fitting the rear bumper we made a mould of from my other car, deleted the exhaust cut-out. will mount then have a cutout for the wheelie bars.

Image

Image

back to the tin. in front of the tubs, and then the rear quarter panels. he keeps saying the tin is almost done. every time i get there he says that. HAHAHAHAA.

Image

Image

Image

Image

and another night time escapade in the Hot Tub Time Machine. relaxation on level 12.

Image


Wed May 27, 2015 12:11 am
Profile
Jr Dragster Poster

Joined: Sun Sep 02, 2012 10:05 am
Posts: 27
Location: USA
Did more tin work. Finished the pieces In front of the tubs. Continued the rib pattern. It's the little details that make a show car worthy haha.

Started the under tub tin. It is there to prevent crap building up on the bulkhead and dropping back in front of the rear tires.

Worked on a fuel tank of a mint 65 street/strip Chevelle, pulled the motor from the Cobra replicar, and had a photo/video shoot of the car as we prepped two cars for this weekends racing. Wife races the MK3 VR6 supercharged GTI and I will run the awd car.

Image

Image

Image

Image

Image

Image

Image

Oops I guess I better pop pix of the work haha

Image

Image

Image


Wed May 27, 2015 12:13 am
Profile
Display posts from previous:  Sort by  
Reply to topic   [ 29 posts ]  Go to page Previous  1, 2

Who is online

Users browsing this forum: No registered users and 3 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
cron
Powered by phpBB® Forum Software © phpBB Group
Designed by ST Software for PTF.